Why a fixture ends up below grade
Drainage runs on gravity and on slope. A 3 inch or smaller drain needs a fall of about 1/4 inch per foot to carry solids properly, and that fall has to hold all the way to where the building drain leaves the wall. The elevation of that point decides everything: anything above it can drain by gravity, anything below it cannot.
In plenty of Toronto houses the sewer leaves the footing higher than people assume, particularly where the lateral was set for a shallow city main. Put a bathroom on that basement floor and the fixtures have nowhere to fall to. They drain into a pit instead, and a pump lifts the discharge up into the building drain. That is a sewage ejector.
Before anything gets drawn we take levels off the existing building drain. Sometimes there is more fall available than expected and the bathroom can be plumbed by gravity, which is cheaper to build and has no motor to fail. Sometimes there is not. Either way it is worth settling before the framing goes up.