Working in a building that has to keep running
The plumbing is rarely the hard part of a commercial job. The hard part is doing it without taking a floor, a kitchen or a bank of washrooms out of service for longer than the building can stand. Before we price anything we want to know what the shutdown looks like: which valves actually hold, and how much of the system goes dark when we close them.
Isolation is the first thing we check on site. In older buildings a lot of the sectional valves are seized or passing, and the only thing that truly stops the water is the main. That changes the job. Often the right first move is replacing one floor isolation valve so the rest of the work can be staged instead of run as one long outage.
Tenant notice, elevator booking, loading dock access and building rules get sorted when we quote, not on the morning of. We work Monday to Friday, and book early starts or Saturday work by appointment when a shutdown has to land outside business hours.