A postwar district ages on a schedule
Because most of Scarborough was built after the mid-1950s, lead water services are far less common here than in the old city.
The build era does most of that work for you. What you get instead is a generation of cast iron drain stacks and vitrified clay laterals now sixty or seventy years old. Cast iron rusts from the inside and usually fails first at the base, where it has sat in waste and damp concrete for decades.
Clay fails at the joints, and roots find joints. If your main drain has backed up twice in two years, that is not bad luck, it is a condition, and a camera costs less than guessing at it.